COMPANY: CMS MECHANICAL
Client: Ministry of Transportation
Project: Coating Existing Structural Steel, Mattagami
River Bridge
Area of Coverage: 11,220 square metres
Surface preparation: SSPC-SP10-89 (Near White Blast Cleaning)
Coating System: Epoxy-Zinc/Vinyl System
Areas
Cleaned and Coated:
- All Structural Steel below deck with the exception of 1000 mm from
the ends of the stringers at both abutments.
- All truss members including top chord, portals and sway bracing
at both ends up to and including the fourth verticals.
- For the portion of truss members in between the fourth verticals,
all steel up to 2 m above bottom chord of the sway bracings.
- Overhead cable support brackets.