K & C POWER HOUSE REPAIR

59 CLEAR LAKE ROAD NORTH, KAPUSKASING, ONTARIO, P5N 2X7

TEL: (705) 337-5211

FAX: (705) 335-6364


PIER UNDERCUT BY FLOODS - STABILIZED AND REPAIRED

A diving inspection revealed serious undermining of one pier (eroded space 6 in. to 2 ft. high by 10 in. to 2 ft. horizontally) most mortar joints in all piers eroded out to depths of 6 in. or more, and many stone blocks loose. Discovered before collapse or serious settlement, the piers were restored by:

(i) Placing flexible forms under the edges of the undermined pier and inflating them with non-shrinking grout. Voids under the pier behind the expanded flexible forms were then pressure grouted with non-shrinking grout.

(ii) Eroded or weakened mortar joints in all piers were raked clean and repointed. Holes were then drilled into the interior and all loose joints grouted tight.

See Page