
Pictured here is a 1995 Kerr Mine underground planning meeting [left to right] John Lutecki (Chief Mine Engineer), Bill Glover (General Manager - Operations), Frank Ploeger (Chief Geologist), Alex Perron (President - Perron Gold), & Bill Gaston (Planning Engineer).
Bill Glover assembled an underground mining crew in 1993 to reopen the Kerr underground & subsequently develop underground longhole stopes & a small open pit to feed the 1500 Kerr Merrill Crowe gold mill. Located 5 minutes from the Quebec border, the Kerr Mine produced over 10 million ounces of gold bullion between 1938 and 1996.
|
|
|
Armistice Resource's / Copper Corp / Victoria Mine / Birchtree Mine / Macassa Mine / Farallon Negro Gold Mine / Dredge / Toburn Mine